Assesmont Group Steel Fabrication Assesmont Group Steel Fabrication
  • News
  • Projects
  • Products
  • Services
    • View All
    • Access Steelwork
    • Aluminium Fabrication Expertise
    • Architectural Steelwork
    • Bespoke Steel Cladding Solutions
    • Bespoke Steel Fabrication
    • CAD & 3D Modelling
    • Discreet Projects
    • Fabrication & Welding
    • Feature Staircases
    • Fire Escape Inspections
    • GRP & Steelwork Fabrication & Installation Services
    • Maintenance & Reporting
    • Metal Soffits & Fascias
    • Site Surveys
    • Spider Crane Hire
    • Steel Erection & Onsite Fitting
    • Steel Fabricators London Essex
    • Structural Design
    • Structural Steelwork
    • Surface Treatment
    • Welding Services
  • Sectors
  • Jobs
  • Sustainability
    • Sustainability
    • Charities
  • About Us
    • Ethos
    • Accreditations
    • FAQs
    • Meet the Team
    • Our Story
Contact
PureGym, Hounslow

Entrance and Mezzanine Structural Support Steelwork

Partnership with Brennan Group

New Entrance Framing & Mezzanine Steel – Project Overview

Introduction

Our work on the new entrance framing & mezzanine steel installation at PureGym Hounslow required careful planning, precise fabrication, and efficient on‑site coordination. From the first design review to the final inspection, we delivered a complete structural steel package that improved both access and usable floor space within the facility.

Entrance Framing Steelwork

The entrance framing included hollow‑section posts, welded baseplates, and bracing members. These components support new cladding and signage, creating a stronger and more durable entrance structure. In addition, all steel was fully galvanised. As a result, the installation offers long‑term protection against corrosion, which is essential in high‑traffic public areas.

To minimise disruption, we scheduled the works around existing pedestrian routes. This approach allowed PureGym to remain operational throughout the installation. It also ensured that safety standards were maintained at every stage.

Mezzanine Steel Platform

The mezzanine steel platform provides PureGym with valuable additional floor area. It was built using primary beams, secondary joists, connection plates, and edge protection steelwork. Each component was fabricated to tight tolerances. Because of this accuracy, the on‑site assembly was fast, safe, and fully aligned with the existing building frame.

Furthermore, our team coordinated lifting operations and temporary works. This ensured that the mezzanine structure was installed efficiently and in compliance with industry regulations.

Quality Assurance & Compliance

All welding was completed by coded welders, and every material was sourced from CE‑marked suppliers. Throughout the project, we carried out inspections and checks to maintain quality. Consequently, the final installation meets both structural and safety requirements.

If you want to explore UK steel section standards, you can visit the Steel for Life Blue Book. You can also follow Assesmont Group updates on LinkedIn.

Conclusion

This project demonstrates how new entrance framing & mezzanine steel installations can transform commercial spaces. With careful planning, accurate fabrication, and safe installation, we deliver structural steel solutions that enhance both function and appearance.

mezzanine scaffold plans Zoom in
IFC for mezzanine steel Zoom in
IFC for entrance steels Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Assesmont Group Steel Fabrication
Facebook Twitter Instagram LinkedIn YouTube TikTok
Where Turn-Around Counts

Assesmont Group Ltd
Shot Farm, Southend Road,
Shotgate, Wickford,
Essex SS11 8RZ


01268 733 582
enquiries@assesmont.co.uk
  • About Us
  • Accreditations
  • Contact
  • Privacy & Cookies
BSI ISO 9001

Content © 2026 Assesmont Group Ltd. All rights reserved.

Powered by Greenhouse