Multi‑Zone Roof Plant Support Steelwork
Assesmont Group Ltd delivered a multi‑zone rooftop steelwork package at Belgrave House in London.
We fabricated five separate plant support structures, each designed for different loading and layout requirements. Because accuracy matters, we produced full fabrication drawings and built every frame in our workshop before transporting them to site.
Each structure used UC and UB sections, splice plates, columns and cross‑bracing. All components were hot‑dip galvanised to ensure long‑term durability. After fabrication, we assembled the frames in‑house, which allowed us to improve quality control and reduce on‑site welding. As a result, installation was faster, safer and more efficient.
Once complete, the frames – weighing between 1.5 and 4 tonnes – were delivered from our yard and crane‑lifted onto the roof during coordinated lifting operations in central London. Our team then secured each frame to existing concrete plinths and carried out full QA checks. With the steelwork in place, the client’s MEP contractors could immediately begin installing their plant. This project highlights Assesmont’s ability to manage complex rooftop steelwork from fabrication to final installation, while maintaining precision, safety and programme certainty.