Assesmont Group Steel Fabrication Assesmont Group Steel Fabrication
  • News
  • Projects
  • Products
  • Services
    • View All
    • Access Steelwork
    • Aluminium Fabrication
    • Architectural Steelwork
    • Bespoke Steel Cladding Solutions
    • Bespoke Steel Fabrication
    • CAD & 3D Modelling
    • Discreet Projects
    • Fabrication & Welding
    • Fire Escape Inspections
    • Maintenance & Reporting
    • Metal Soffits & Fascias
    • Site Surveys
    • Spider Crane Hire
    • Steel Erection & Onsite Fitting
    • Structural Design
    • Structural Steelwork
    • Surface Treatment
  • Sectors
  • Jobs
  • Sustainability
    • Sustainability
    • Charities
  • About Us
    • Ethos
    • Accreditations
    • FAQs
    • Meet the Team
    • Our Story
Contact
The St Christopher School, Leigh on Sea

Major Repairs to External Escape Stairs & Walkway Steelwork

We are delighted to have been commissioned to carry out some major repairs to the external escape stairs and walkway at The St. Christopher School in Leigh on Sea, Essex.

We provide BS 8210:2020 Building Escape Routes inspections, maintenance, reporting. Where required we supply full fabrication and installation of associated steelwork, including gantries, walkways, CAT ladders, access hatches and fie escape staircases.

Following on from inspections we carried out at The St Christopher School, we recommended the following rectifications, which have been accepted. Work started immediately.

🔸 Remove existing and install new gates/doors + frame at staircase bottom, including new push bar system and hinges.
🔸 Ream out structural steel connection fixing holes and install new fixings where missing or too short.
🔸 Relevel landing floor plate to eliminate trip hazard.
🔸 Refit handrail to staircase and walkways, addressing missing fixings and spigot misalignment.
🔸 Relevel mesh panels and replace missing fixings/clips.
🔸 Jet wash stairs and walkway steelwork to remove mildew/bird droppings, then apply Galvafroid to treat surface rust.
🔸 Install new riser plates to all stair treads to close gaps and remove trip hazards.

BS 8210:2020 Facilities Management recommends a structural survey of the external fire escapes, CAT ladders, platforms and gantries – in fact any route that can be deemed as an escape route – of a building at least every 5 years as well as annual visual inspections.

Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Zoom in
Assesmont Group Steel Fabrication
Facebook Twitter Instagram LinkedIn YouTube TikTok
Where Turn-Around Counts

Assesmont Group Ltd
Shot Farm, Southend Road,
Shotgate, Wickford,
Essex SS11 8RZ


01268 733 582
enquiries@assesmont.co.uk
  • About Us
  • Accreditations
  • Contact
  • Policies & Insurance

Content © 2026 Assesmont Group Ltd. All rights reserved.

Powered by Greenhouse