Assesmont Assesmont
  • News
  • Projects
  • Products
  • Services
    • View All
    • Access Steelwork
    • Architectural Steelwork
    • Bespoke Steel Cladding Solutions
    • Bespoke Steel Fabrication
    • CAD & 3D Modelling
    • Discreet Projects
    • Fabrication & Welding
    • Fire Escape Inspections
    • Maintenance & Reporting
    • Metal Soffits & Fascias
    • Site Surveys
    • Steel Erection & Onsite Fitting
    • Structural Design
    • Structural Steelwork
    • Surface Treatment
  • Sectors
  • Jobs
  • Sustainability
    • Sustainability
    • Charities
  • About Us
    • Ethos
    • Accreditations
    • FAQs
    • Meet the Team
    • Our Story
Contact
Wolff Onsite

Cantilevered 'Big Red' Offset Man Cage

We’re delighted to have received an order from WOLFF Onsite for a third (and now a fourth) ‘Big Red’ offset cantilevered man cage. Originally, when Wolff Onsite were on the lookout for a steel fabricator to produce Europe’s first offset access cage, they came to Assesmont Group Ltd to produce the goods.

A key requirement of any operational construction site is a facility for the safe and speedy transfer of personnel and product to/from areas of the site that may be difficult to reach by other means. Assesmont designed the access cage from scratch, and calculated all counterweight, balancing and lifting requirements. We also carry out all the requisite stress tests.

The 4-people carrier unit consists of an extension with sides rising above waist height with a handrail. The harness points are located between the cage and the extension.

Assesmont
Facebook Twitter Instagram LinkedIn YouTube TikTok
Where Turn-Around Counts

Assesmont Group Ltd
Shot Farm, Southend Road,
Shotgate, Wickford,
Essex SS11 8RZ


01268 733 582
enquiries@assesmont.co.uk
  • About Us
  • Accreditations
  • Contact
  • Policies & Insurance

Content © 2026 Assesmont Group Ltd. All rights reserved.

Powered by Greenhouse